Children’s Pre-Assessment Unit, Whipps Cross Hospital

Works included:

–          Asbestos R&D survey and report

–          Full design considering HTM, HBN and Building Regulations compliance

–          Engage Building Inspectors and production of fire strategy with client and site Fire Officer

–          Strip out existing office fit out

–          Form new internal layout with C-stud partitioning

–          Bring in medical gasses and VAC

–          New electrical system

–          New bedhead clinical trunking to each bay

–          Nurse call system installation

–          New cylinder for H/W demand

–          A/C heating and cooling with secondary back up heating system

–          New suspended ceilings

–          New lighting

–          Main entrance auto opening door on access control and secondary means of escape

–          New DDA compliant ramps, barriers and road markings

–          Flooring and decorations throughout

–          Clinical spec fire door set supply and installation.

–          New clinical sanitaryware

As part of the hospital’s COVID 19 development strategy, Inigo were engaged and tasked with creating an clinical space to keep children out of the main A&E ward at Whipps Cross Hospital.

The client had identified a small pre-fab building nearby and Inigo produced a design to create clinical space comprising 4 new pre-assessment rooms, reception area, waiting room, dirty and clean utilities, WC’s and staff kitchen area.

The design was formed in 2-weeks in conjunction with the clinical team during numerous design meetings. The design and works were started and completed in 3-months.

The clinical staff are delighted with their new area which went into immediate use upon completion.