Mile End Hospital MRI Unit

Works included:

  • Mechanical and Electrical works
  • Fire Compartmentalisation
  • Formation of New Staff Toilets, Male and Female Staff Changing Rooms and Storerooms
  • Formation of New Reception and Staff Rest Room
  • Flooring Works
  • Suspended Ceiling Works
  • Decoration Works
  • Whiterock Wall Protection
  • Groundworks and Below Ground Drainage
  • Substructures, Groundworks and Below Ground Drainage
  • Construction of new cavity walling
  • Formation of new roof
  • Supply and install new fire escape external door and frame sets
  • Formation of New Internal Partitions to Form New Layout
  • Shielding works
  • Supply and install new internal fireproof doors
  • Formation of New Staff Toilet, Patient Toilets to Changing Rooms and Cannulation Room
  • Formation of New Consent Room and MRI Control Room
  • Flooring Works
  • Installation of Fire Alarm Systems and Security Systems
  • Electrical IPS and UPS Systems
  • Supply and install new air volume changes
  • BMS System
  • External Acoustic Fenced Enclosure
  • Back-up Generator

Inigo were appointed to carry out the design, construction, and installation of a new 3T MRI unit at Mile End Hospital.

Inigo feel very privileged to be one of only a few contractors in the UK to be awarded such a contract which forms part of the trusts strategy to tackle the diagnosis backlog.

On a severely constrained site Inigo were able to deliver this project on time and on budget to the client’s great acclaim, receiving high praise from all involved in the trust.